Artwill, Interior Design House
New Territories 2022 Interior Design & Build

Mayfair by the Sea 8

Mayfair by the Sea 8 is an interior design project completed by Artwill Interior Design House in 2022, located in New Territories, a unit handled by Regina Kwok and the design team across Interior Design & Build.

Designed by Regina Kwok and the Artwill team

Mayfair by the Sea 8

A home at Mayfair by the Sea 8 in Pak Shek Kok, designed and built in a modern British style for a couple and their cat.

The interior design pairs timber with royal blue, accented by richly nostalgic copper, and lifts it with elegant stone-textured touches at the foyer and on the television wall. We swapped the usual ceiling lights for textured pendants and wall lamps to bring a romantic note into the living space, and built a large bookshelf into the new work area for the family's book collection, with glass-fronted cabinet doors here and there to keep the room feeling open.

The real puzzle was the entrance, long, narrow and a touch cramped. We laid blue and yellow marble tiles in earthy tones along it, which immediately breaks up the tunnel-like view and turns the approach into something with real visual pull. A navy sliding door then separates the entrance hall from the main hall, drawing a clear line between the two zones.

We folded the guest room into the living area and used a sofa and a bar counter to split it into a seating zone and a dining zone, all without spoiling the view. The television cabinet runs out to the window sill with curved accents, leaving the cat its favourite spot near its owners. The master bedroom sits behind a walnut-veneer hidden sliding door, with a new walk-in closet behind the bed whose doors mix clear glass and deep-blue timber framing with fine floral detail, the British note again. Nearly all the joinery was custom-made by our trusted partner factory.

Blue and yellow marble breaks up the tunnel-like view, and turns the entrance into something with real pull.

Project Photography

Inside the project

Mayfair by the Sea 8, common questions

Where is Mayfair by the Sea 8 located and which district?
The project is located in the Hong Kong district shown in the sidebar above. Artwill has completed 500+ projects across all 18 Hong Kong districts since 2004.
How long did Mayfair by the Sea 8 take to complete?
A typical Artwill residential project runs 4 to 9 months from first site survey to handover: 6 to 12 weeks design, 12 to 24 weeks build, 2 to 4 weeks snagging. Actual timeline depends on whether structural alterations are involved.
How large is the unit at Mayfair by the Sea 8?
Please see the floor area shown in the project sidebar above. Artwill's case library spans 400 sqft compact apartments to 4,000+ sqft duplex residences.
What is the budget range for a project like Mayfair by the Sea 8?
Artwill residential pricing depends on unit size, finish level, and joinery scope. Actual pricing is confirmed after the measured survey and design development stage. Fees on enquiry.
ADDRESS 19/F., 103 Hennessy Road, Wan Chai, Hong Kong
OPENING HOURS
Monday 10:00 AM to 7:00 PM
Tuesday 10:00 AM to 7:00 PM
Wednesday 10:00 AM to 7:00 PM
Thursday 10:00 AM to 7:00 PM
Friday 10:00 AM to 7:00 PM
Saturday Closed
Sunday Closed
INSTAGRAM FACEBOOK YOUTUBE 小紅書
Artwill WeChat QR code

Open WeChat, Discover, Scan

Or save the QR and import it from your gallery.

Get a Free Quote