Design and Build Hong Kong
Design and build in Hong Kong by Artwill. One team, one contract, one accountability point from first sketch to keys handed over. No coordination gap between designer and contractor because we are both. Lump-sum fixed price after design lock, 6-stage payment schedule, 12-month workmanship warranty. A typical 1,500 sqft Hong Kong residential project delivers in 32 weeks, approximately 4 to 6 weeks faster than sequential design-bid-build procurement.
One team, one contract, one timeline, one accountability
Traditional design-bid-build splits your project across separate designers and contractors. The joint between them is where budgets blow up. Artwill's design-and-build collapses both into a single team with one contract and one timeline. Design and procurement happen in parallel during the final weeks of design development, saving the 4 to 8 weeks of contractor tender that sequential procurement requires. All custom joinery is produced by trusted partner factories, coordinated by Artwill with full oversight of quality and delivery.
End-to-end design and build
-
Single Contract
One agreement covers concept design, statutory submissions, construction, FF&E, and final handover.
-
Fixed-Price Certainty
Lump-sum pricing locked after design development. No hourly variations, no surprise charges.
-
Faster Programme
Design and construction overlap, typical 4 to 6 weeks faster than sequential design-then-build.
-
Joinery & Trades
Carpentry and joinery by partner furniture factories with Blum and Hettich hardware; all trades coordinated by Artwill.
-
Single Snag List
One team owns the defect-correction process, no finger-pointing across designer-contractor boundary.
-
12-Month Warranty
Workmanship warranty covering both design intent and build quality, for 12 months.
Design and build in 4 phases, 32 weeks
- 01
Discovery
Week 1: brief, site survey, budget alignment, 5-day fee proposal.
- 02
Design Lock
Weeks 2 to 10: concept through developed design, lump-sum signed before site mobilisation.
- 03
Build
Weeks 11 to 30: daily on-site supervision, weekly client reviews, workshop fabricates joinery in parallel.
- 04
Handover
Weeks 31 to 32: snagging, final clean, keys, photo handover pack, 12-month warranty starts.
Design and build, common questions
What's the difference between design-and-build and hiring a designer and contractor separately?
The traditional 'design, then tender, then build' model splits responsibility across two contracts and two teams. Variations and delays typically happen at the seam. Design-and-build collapses both into one: one contract, one timeline, one source of truth. Artwill prepares the build scope and procurement list during the design phase, avoiding the 4 to 8 weeks lost on a separate contractor tender after design is complete.
Is design-and-build more expensive than hiring separately?
Usually the total cost is similar or lower. You typically save the 5 to 10 percent coordination markup that separate contractors add to factor in design ambiguity. The biggest advantage of design-and-build is timeline and certainty rather than price; for equivalent quality and materials, total cost moves within ±5 percent. But the more complex the project (structural changes plus luxury imported materials), the more split tendering is prone to 15 to 25 percent budget overruns, whereas design-and-build holds the locked price.
Can I bring my own architect or contractor into a design-and-build project?
Yes, but the benefit reduces. The model works best when one team owns design and build end-to-end. If you have a trusted contractor, we can still do design-only. If you have a designer you would like to retain, we can do project-management-only. Pricing for each is quoted per project after a free consultation. Hybrid arrangements should be discussed in the initial consultation.
How is pricing structured?
After design lock, Artwill issues a single lump-sum build price. No hourly variations, no daily rates, you know the full cost before we mobilise on site. Standard 6-stage payment schedule: 10 percent on contract signing, 25 percent at site mobilisation, 25 percent at structural and M&E completion, 20 percent at joinery and stone installation, 15 percent at painting and final fixtures, 5 percent retention released after snagging closure.
How much faster is design-and-build than sequential procurement?
For a typical 1,500 sqft Hong Kong residential project: traditional sequential model (design 8 weeks, contractor tender 4 weeks, build 24 weeks, snagging 2 weeks = 38 weeks total). Design-and-build (design 10 weeks with procurement prep in parallel, then build 22 weeks, snagging 2 weeks = 32 weeks total). Real savings 4 to 6 weeks. For commercial office fit-outs where landlord rent-free periods are pressure-on-clock, the timeline advantage is even more valuable.
What's the variation cap on a design-and-build contract?
Artwill's design-and-build contracts include explicit variation clauses. Client-requested changes (switching to more expensive stone mid-build, adding a smart-home module) are quoted per item from a pre-agreed schedule of rates and signed off before work. Non-client-requested changes (discovered structural issues, M&E worse than expected) are quoted by us under the schedule of rates; anything exceeding 5 percent of contract value requires client approval. Typical total variation runs 5 to 10 percent of contract value; above 15 percent indicates insufficient design definition at lock, which we flag for re-optimization before contract signing.